The substrate must be clean, dry and degreased, and the joint must have uniform geometry; The sealant is selected according to the materials and conditions. The most important thing is to prepare the input conditions, the correct order and control the result before moving on.

In brief The substrate must be clean, dry and degreased, and the joint must have uniform geometry; The sealant is selected according to the materials and conditions. The most important thing is to prepare the input conditions, the correct order and control the result before moving on.
Budget friendliness 6/10

The higher the score, the lower the typical cost impact of this work stage.

Quality impact 8/10

The higher the score, the stronger this stage affects final quality and durability.

Ease of execution 6/10

The higher the score, the easier this stage is to complete correctly without too many dependencies.

In brief

The substrate must be clean, dry and degreased, and the joint must have uniform geometry; the sealant is selected according to the materials and conditions.

The most important thing is to prepare the input conditions, the correct sequence and control the result before moving on.

Goal and result of the stage

The "Siliconizing corners" process is used to create a stable, even and tight cladding with the correct layout, joints and expansion joints.

When to perform this step

This topic should be considered after acceptance of the subfloor and waterproofing where required, before installing the equipment.

The deadline results from technical dependencies. Doing it too early may result in damage to the finished work, and doing it too late may result in blocking access or requiring corrections.

What must be ready before start

Before starting, prepare: checking the evenness, load-bearing capacity and moisture of the substrate, layout plan, selection of glue, trowel, expansion joints and cutting method.

Materials, tools and documents

Typical materials and auxiliary elements: tiles with a spare, glue selected for the substrate and format, primer and waterproofing if necessary, grout, flexible sealant.

Typical tools and equipment: cutter or appropriate disc, notched trowel, level or laser, mixer, surface control system, suction cups for large formats.

Correct execution order

  • Collect the substrate and waterproofing, then plan the layout and cutting places.
  • Set out the baseline lines and make a test layout in critical places.
  • Prepare the glue in accordance with the technical data sheet and apply it with a tool selected for the format.
  • Lay the tiles in open time of the adhesive, controlling the support, plane and width of the joints.
  • After setting, make the joints, maintain the expansion joints and seal the flexible places with the appropriate material.

Execution conditions

Control temperature, humidity, ventilation, substrate condition and conditions specified by the manufacturer. Drying or setting times depend on product, layer thickness and conditions - do not shorten them based on surface appearance alone.

If different system instructions specify different requirements, adopt a more stringent condition or confirm with the manufacturer.

Quality Control

Perform the inspection in conditions appropriate for subsequent use and before covering the work with another layer.

  • the joint adheres to both sides
  • the surface is smooth without voids
  • the drain or service element is not closed
  • the system is consistent with the plan, and the cuts do not create random narrow strips

Safety and boundaries of independent work

Protect your eyes and respiratory system when cutting and mixing. Move large formats in groups and with appropriate handles. Do not use damaged discs, drills or suction cups.

Common errors

  • silicone on wet grout
  • adding new silicone on the old one
  • too thin joint, impossible to work
  • laying without a plan, with accidental touches and without preservation expansion joint

Difficulty, time and risk of errors

Execution variants

Tiles can be laid traditionally, with a plane control system or using methods intended for large formats. The variant does not exempt you from preparing a level surface and checking the glue.

What next after finishing

After the glue has set, perform grouting and flexible joints according to the system. Only start loading, washing and assembling the equipment after the required time.

Frequently asked questions

What does “Siliconizing the corners” involve?

The substrate must be clean, dry and degreased, and the joint must have uniform geometry; The sealant is selected according to the materials and conditions. The most important thing is to prepare the input conditions, the correct order and control the result before moving on.

What needs to be prepared before the "Siliconizing the corners" stage?

Before starting, prepare: checking the evenness, load-bearing capacity and moisture of the substrate, layout plan, selection of glue, trowel, expansion joints and cutting method.

How can you verify that “Siliconizing the corners” has been done properly?

Apply in conditions suitable for subsequent use and before covering the work with another layer. • the joint adheres to both sides • the surface is smooth without voids • the drain or service element has not been closed • the layout is consistent with the plan and the cuts do not create random narrow strips

When is it better to entrust the "Siliconizing the corners" stage to a specialist?

Outsource work when it involves active installations, structures, tightness, large or heavy components, or requires equipment and experience that you do not have. Don't study on a high value ready-made surface.