When to report defects and request remedial work — practical guidance and quality checks
The defect shall be reported after it has been reliably identified, as soon as possible and before it is obscured or further damaged, in accordance with the contract and regulations. Base your control on agreed standard, measurement and documentation, not just visual impression.
In brief
The defect shall be reported once it has been reliably identified, as soon as possible and before it is obscured or further damaged, in accordance with the contract and regulations.
Base inspection on agreed standard, measurement and documentation, not solely on impression visual.
What is controlled
The "When to submit corrections" process is used to compare the performance with the agreed scope and detect defects, omissions and risks before closing the stage.
When to check
The "When to submit corrections" check should be performed before covering the work, assembling subsequent elements, making final payment or commencing use.
Defects visible only after covering should be checked at inter-stage inspections.
Documents and conditions of receipt
Before you start, prepare: a contract, a design or established standard, product manuals, a list of checkpoints, good lighting and measuring tools.
Control Tools
Typical materials and supplies: form or report, fault markers, photo documentation, manuals and data sheets.
Typical tools and equipment: level or laser, staff, tape measure, flashlight or side light, camera, function tester specific to installation.
How to check
- Establish acceptance criteria based on the contract, design, instructions and agreed standard.
- Provide conditions for defects to be seen without artificial exaggeration or concealment.
- Inspect the surface visually, then perform measurements and functional tests.
- Record any discrepancies with the location, photo, meaning and expected method of repair.
- Make a decision on acceptance, conditional acceptance or refusal for a specific scope.
Conditions for reliable reception
Conduct "When to submit corrections" inspection in conditions similar to normal use and with lighting that allows you to assess the effect without artificially hiding or exaggerating defects.
Record measurements along with the place, tool and conditions control.
Acceptance Criteria
Inspection should be carried out in conditions suitable for subsequent use and before covering the work with another layer.
- the report is in writing
- includes photos and location
- a safe method of further use has been established
- the inspection refers to an agreed standard, not exclusively subjective impression
Limits of self-control
Do not perform installation tests using methods that may cause shock, flooding or damage to devices. Entrust specialist measurements to people with appropriate equipment and qualifications.
Common reception errors
- waiting until the end of the entire renovation
- self-repair making assessment impossible
- report only by phone
- collection in a hurry, without documents, lighting or measuring tools
Difficulty, time and risk of errors
Partial, conditional and final acceptance
The acceptance may be partial, inter-branch, final or conditional. The more elements that are covered later, the more important it is to receive them before covering them.
What to do with the check result
After receipt, sign the report or list of defects, set the deadlines and rules for re-inspection. Do not delete photo documentation until all corrections are completed.
Frequently asked questions
What does “When to submit corrections” involve?
The defect shall be reported after it has been reliably identified, as soon as possible and before it is obscured or further damaged, in accordance with the contract and regulations. Base your inspection on agreed standard, measurement and documentation, not solely on visual impression.
What do I need to prepare before the "When to submit corrections" stage?
Before you start, prepare: a contract, a design or agreed standard, product manuals, a checkpoint list, good lighting and measurement tools.
How can you verify that “When to submit corrections” has been done properly?
Apply in conditions suitable for subsequent use and before covering the work with another layer. • the report is in writing • includes photos and location • a safe course of further use has been agreed • the inspection relates to an agreed standard and not solely to a subjective impression
When do I need a specialist for "When to submit corrections"?
A specialist is needed when measuring installations, tightness, structure, humidity requiring interpretation and wherever an incorrect reception may hide a technical defect.